Prices, Promotions, styles, and availability may vary. Our local stores do not honor online pricing. Prices and availability of products and services are subject to change without notice. Errors will be corrected where discovered, and Lowe's reserves the right to revoke any stated offer and to correct any errors, inaccuracies or omissions including after an order has been submitted.

Vinyl 10 -lb Concrete Patch

QUIKRETE Vinyl 10 -lb Concrete Patch

4.6
532

What is drying time


This vinyl concrete patcher has approximately 4 to 6 hours as a set time and it supports foot traffic in 1 day and wheeled traffic in 3 days.

Was this Answer Helpful ?

QUIKRETE® Vinyl Concrete Patcher is a standard setting cementitious mortar, so it will have a typical set time of approximately 4 to 6 hours if the temperature is approximately 70 degrees Fahrenheit. Mix only as much as can be applied in 30 minutes. At higher temperatures, the set time will be somewhat faster, while at cooler temperatures, it will be slower. The product will support foot traffic in one day and allow three days for wheeled traffic. This would be under ideal conditions, including a temperature of approximately 70 degrees Fahrenheit. The colder the temperature, the longer you will need to wait. Although it will be set, or hardened after 4 to 6 hours, it does not yet have significant strength gain at that point. The length of time for freshly placed cementitious mortar to dry will vary and dependent on water content used to mix the concrete, curing temperatures, humidity, weather exposure, etc.

Was this Answer Helpful ?