Tools and Materials
Product costs, availability and item numbers may vary online or by market.
Expert Tips
- Before laying cinder blocks, pour a footing. This will serve as the foundation for the blocks.
- The footing should be poured below the frost line, which will vary according to the location. It should be allowed to cure for a minimum of seven days before installing blocks on top. Begin by laying the corner blocks and securing them with mortar.
- Blocks should be stacked in an alternating pattern. Be sure to apply mortar to the sides of the blocks before stacking the next row.
Laying Block
Note: For load-bearing walls, consult your local codes for reinforcement requirements. Build your block structure to last. Watch our DIY Basics video: What Do Level and Plumb Mean?