Prices, Promotions, styles, and availability may vary. Our local stores do not honor online pricing. Prices and availability of products and services are subject to change without notice. Errors will be corrected where discovered, and Lowe's reserves the right to revoke any stated offer and to correct any errors, inaccuracies or omissions including after an order has been submitted.

QUIKRETE Concrete Planter

12339
Get Pricing & Availability

Items Included in this Collection

Step 1: Gather your forms (we used 3- and 5-gallon buckets). Use cooking spray to coat the inside of the large bucket and the outside of the small bucket. Step 2: Mix concrete in a tub (wear rubber gloves and a mask) following package directions. Step 3: Pour the mixture into the large bucket to about the halfway mark. Slide the small bucket into the center of the large bucket and push down to within 2 inches of the bottom. Step 4: Use bricks, stones, or sand to weight the small bucket. Secure the weighted small bucket with duct tape so it doesn't rise. Step 5: Remove the weights after 48 hours. Slit the inside of the small bucket and remove. Slit the outside of the large bucket and remove. Step 6: Use a masonry bit to drill a hole in the side or bottom of the container for drainage.