I have 2 electrical panels, do I need 2 units? with solar also
1
If you can install the Wiser Energy meter at the incoming feed for both panel they can use one meter as long as it is 200A services or less. Ideally if the one panel feeds the sub panel then they just need one. If they have no way of installing Wiser at the main feed then two meters will be needed with two Wiser accounts. Regards, Schneider Electric Customer Care.