Prices, Promotions, styles, and availability may vary. Our local stores do not honor online pricing. Prices and availability of products and services are subject to change without notice. Errors will be corrected where discovered, and Lowe's reserves the right to revoke any stated offer and to correct any errors, inaccuracies or omissions including after an order has been submitted.

(Sample) TimberCraft +WetProtect with Underlayment Attached Chester Ridge Hickory 12-mm T x 7-1/2-in W Waterproof Laminate Wood Flooring

Pergo (Sample) TimberCraft +WetProtect with Underlayment Attached Chester Ridge Hickory 12-mm T x 7-1/2-in W Waterproof Laminate Wood Flooring

4.4
597

Can this product be used over hydronic radiant heat in a concrete slab?


Hello! Pergo flooring can be used in combination with many types of in-floor heating. The heating system can be cast in a concrete floor or in a thin layer of filler on the surface of a concrete subfloor. It can also be installed under a wood subfloor or installed on the surface of the subfloor as an electrical matting as long as it meets the floor flatness requirements. a. Follow the instructions from the supplier of the floor heating system. b. Concrete subfloors must be installed and cured with no heat transfer for a minimum of 60 days. c. The heating system must be in operation for at least two weeks before installation. The system may be turned off or set to a suitable installation temperature (65 to 72°F). d. The flooring surface temperature, which is the surface of the subfloor or the heat radiating from electric heating mats, should not exceed 84°F (29°C). Thank you for your inquiry. -Amy

pergo-reviews Team Was this Answer Helpful ?

Hello! Pergo flooring can be used in combination with many types of in-floor heating. The heating system can be cast in a concrete floor or in a thin layer of filler on the surface of a concrete subfloor. It can also be installed under a wood subfloor or installed on the surface of the subfloor as an electrical matting as long as it meets the floor flatness requirements. Follow the instructions from the supplier of the floor heating system. Concrete subfloors must be installed and cured with no heat transfer for a minimum of 60 days. The heating system must be in operation for at least two weeks before installation. The system may be turned off or set to a suitable installation temperature (65 to 72°F). The flooring surface temperature, which is the surface of the subfloor or the heat radiating from electric heating mats, should not exceed 84°F. Thank you for your Pergo inquiry. -Amy

Was this Answer Helpful ?