
MAPEI Self Leveler Plus (Pallet 36 qty) 50-lb Powder Indoor Self-leveling Underlayment
what happens if you do not prime a concrete surface? Im confused why it would be ness? Why would the self leveler pull up if heavy floor is atop it?
1
Thank you for your inquiry regarding MAPEI Products! Primers act as "bond promoters" before applying a Self Leveler to a subfloor. MAPEI specifically follows the TCNA (Tile Council of North America) and the NWFA (National Wood Flooring Association) Installation Guidelines for their specific floor preparation requirements and are listed as follows: Existing Cement Mortar Beds and Cement Screeds 6.1 The use of an appropriate MAPEI primer is required. Consult Reference Guide RGC0609, “Primers for Self-Leveling Materials – Product Selection Guide,” for primer selection. Refer to current TDSs for details. 6.2 Do not install MAPEI self-leveling underlayments over any patching compounds or skimcoating products. 6.3 MAPEI self-leveling underlayments may be installed over cement screeds and cement mortar beds when they are sound and durable, securely bonded, stable, clean, dry and fully cured. 7. Gypsum-Based Concrete, Existing Gypsum-Based Poured Please review and call us here at Tech Support Mon-Fri from 8 am to 5:30 pm EST at 800-992-6273 for more assistance if necessary. Thank you! Product Advisor # 11
Was this Answer Helpful ?