
QuickStep Studio + Spill Repel Toasted Chestnut 12-mm T x 5-in W x 48-in L Waterproof Laminate Wood Flooring ( 17.53-sq ft / Carton )
How many days and at what temp does this product need to sit in the room before installation?
2
The instructions say 48 hours.
Was this Answer Helpful ?3-5 days is a typical acclimation. Stack the boxes in a criss-cross pattern with 2in of space between the boxes and slice the plastic on the top of the ends to let the laminate breathe.
Was this Answer Helpful ?