
Two Bags or Three?
Use our Mulch Calculator to estimate how much mulch you'll need for your landscaping projects.
Prices, promotions, styles, and availability may vary. Our local stores do not honor online pricing. Prices and availability of products and services are subject to change without notice. Errors will be corrected where discovered, and Lowe's reserves the right to revoke any stated offer and to correct any errors, inaccuracies or omissions including after an order has been submitted.
Create a beautiful patio block mailbox column in a few simple steps. This weekend project will add curb appeal to your home and stability to your mailbox.
Use this checklist when you go to the store and purchase your items.


Install the first course. Place the blocks as shown, centered within the 42-inch square. Level front-to-back and side-to-side, making sure each block is level to each other. Insert the interlocking pins into the pinholes.

Install the second course. Center the next course of units using the interlocking pins for alignment, and secure them with adhesive when necessary. Insert the pins into the pinholes. Continue to build the column, alternating between course layouts.

Install the first mailbox course. Place the units and secure with adhesive when necessary. Use a semirigid backing material, (e.g. non-expanding spray foam) to create a seal 4 inches behind the face of the mailbox. Next, fill in the space around the mailbox with grout so that it’s flush with the mailbox face. Make sure the mailbox will open and close freely. Insert the interlocking pins in the highlighted center pinholes.

Install the second mailbox course. Place the units and secure with adhesive when necessary. Fill in the space around the mailbox as described in the previous step. Clean and dry the top surface of these units to prepare for the cap units.

Finish with 12 caps. Once you have all eight of the caps for the bottom layer in place, lift one cap at a time and glue the caps to the column using concrete adhesive. Center the four caps for the second cap layout to complete the column.
*Time and Cost are estimated.